Description
Free Delivery Around the Island This Product is not Delivered to Rodrigues Septic Tank Capacity: 1800L | 3000L | 4700L | Waste-water (black water from Toilet) enters the septic tank through a 110mm diameter pipe on which a venting pipe (Air Vent) should be connected. For each flush, waste-water flows down through the pipe picking up oxygen through the air vent pipe. As waste-water enters the septic tank, it is segregated in three segments: Segment A – Upper part of the septic tank consists of Fats, Oil and Grease (FOGs). In this zone, aerobic bacteria gradually degrade the FOGs. Segment B – Middle part of the Septic tank is the Aerobic zone consisting of suspended matter, oxygen and aerobic bacteria. In this segment, the organic matter is degraded to form Carbon dioxide and Water. Carbon dioxide diffuse out through the Air vent. Segment C – Anaerobic zone consist of sludge (mixed of settled solid degradable organic matter and dead cells of bacteria) and anaerobic bacteria. In the anaerobic process, carbon dioxide, hydrogen sulphide, methane and water are formed. These gasses get diffused out through the air vent pipe. The treated water passes through the pre-filter basket into the absorption pit. SIZING OF SEPTIC TANKS Average Waste-water generation per person: 180L/day Retention Time for Treatment and Reaction:48H (2 days) Volume Required for Treatment = Volume of Waste-water Generated Volume of Waste-water generated in 48 hours = No. of Person x Wastewater Generated Per Person x 2 For example: A family of 5 persons will require a 1,800 L Septic Tank (5 x 180 Lt x 2) INSTALLATION PROCESS Step 1: Excavation: – Dig to a depth that will provide a maximum of 300 mm of fine soil over the top of the Septic tank. Allow 230 mm around the tank. Step 2: Bedding: – Allow for a minimum of 150 mm of compacted bedding material rock sand. Bed the rock sand and make sure the surface is levelled. Placed the septic tank on the levelled bed. The septic tank is supplied with PVC sleeves [internal diameter 110 mm] at the inlet and outlet. The inlet and outlet pipes should be glued to the sleeves using standard PVC glue. Step 3: Backfilling: – Ensure the tank lid is properly screwed on the tank manhole. Fill the tank with water through the inlet as you backfill, keeping the water level even with the backfill level. This will prevent possible distortion of the tank and its manhole. Do not remove the lid until the end of the backfill process. Backfill in layers of 200 mm at a time and properly compact each layer. Ensure to compact each end first. Compact the backfill under the inlet and outlet before fixing the pipes. Maximum backfill over the top is 300 mm. Mound fine soil over the top to provide positive drainage NOTE: In case the septic tank needs to be installed with more than 300mm of soil above its top, it must be protected by a heavy-duty concrete slab. THE SLAB MUST REST ON FIRM SOIL AROUND THE TANK Step 4: Septic Extension: – In case the manhole screwed lid does not reach the ground level, a septic extension will be required. Install the extension to the manhole outlet before starting the backfill process. Make use of Duraco septic extension EXCLUSIVELY. The screwed lid supplied with septic will fit the septic extension. Step 5: Leaching Field or Drain Field Material: – The home sewer drain needs to slope at least ¼ inch per foot downhill to the inlet of the septic and the outlet pipe must cater for a downhill slope of 1/8 inch per foot to the absorption pit. The absorption pit should be at a distance of not more than 3 m from the septic and its volume must be at least similar to that of the septic tank. Maintenance: To keep a septic tank functioning properly, it is advisable to have the septic tanks pumped every five years. lf the septic tank has not been utilized for a long period, it is advisable to flush toilets several times to re-activate the aerobic process of the septic tank. Caution: Failure to comply with the points below voids the warranty Do not install any tank in water saturated clay or in high water table. The tank may collapse and its content will escape. Tanks are not fire-resistant. Do not store them near an open flame or heat in excess of 180°F, Do not install any tank under the path of vehicles or heavy equipment unless protected by a heavy-duty concrete slab, without resting on the septic tank. When the septic tank is pumped for normal maintenance; it should be refilled immediately. Our septic tanks are designed for underground use only. Protect the tank from sharp objects which could cause leakage. Avoid abusive use of detergent
Reviews
There are no reviews yet.